Pages: 1
Posted on 08-21-11, 12:45 pm
Buster Beetle


Karma: 379
Posts: 185/464
Since: 06-29-11
Here are a few things the progress paths need.
-When adding progress path, the new path should be the next number in order, not revert back to ID 0. Similar to how creating the next door automatically selects the next number in line.

-Dragging the path off screen to scroll in any direction causes the path to go way too fast. So as soon as you drag, you are miles away from what you are building.

-Just as the views used to be, when selecting the path, the editor drags you back to the beginning of the path. Can we repair this just like the view resizing was fixed? So when you select the second node in a path to view, it doesn't send you all the way to the first.
Posted on 08-21-11, 06:03 pm
Fuzzy
Full mod

Karma: 1183
Posts: 118/785
Since: 06-28-11
  1. Fixed in r212.
  2. I have no clue why this is happening...
  3. I don't see a problem here. The editor scrolls to the first node of the path when it is selected, but it scrolls to the selected node otherwise.

Pages: 1